home
--> projects
under construction
-->
daniels
-->
builing
a
Daniels
- Building A

Project
Description:
Two-story
office building
Building
A |
Ground
Level Dock Doors |
Dock
High Dock Doors |
2 |
1 |
| First Floor
Area: |
1,650 s.f. |
| 2nd Office: |
5,112 s.f. |
| Warehouse: |
1,650 s.f. |
| Manufacturing: |
5,112 s.f. |
| Total
Building s.f.: |
22,450 s.f. |
Click
on the links below to view the plans in .pdf
files:



|
Project
Address:
Redwood Street
Chino, CA
Owner:
Chalmers Corporation
Architect
/ Designer:
MacDavid Aubort
Structural
Engineer:
O.C. Engineering
Construction
Type:
Concrete Tilt-up
|
|